P&L CPM report groups

For ease of scheduling, report run options can be set up in a report group. A report group can be run with the entry of an overriding reporting year and period range.

  1. At the EMMS main menu, select Administration | Reports | P&L CPM Reports | P&L Report Table Setup | Work With Report Groups. The P&L CPM Report Groups display screen appears.
  2. Click Add plus.jpg. The Add P&L CPM Report Group screen appears.
  3. Fill in the fields as required.
  4. Click Enter enter.jpg. The Confirm prompt appears.
  5. Click Confirm. The P&L CPM Report Group Reports display screen appears.
  6. Click Change change.jpg. The Select P&L CPM Reports for Group screen appears.
  7. If necessary, click Toggle All/Unselected allsel.jpg to view all available reports.
  8. Right-click on a report to be added to the group and select Select. An asterisk will appear in front of the group.
  9. Repeat step 8 as required.
  10. Click Exit exit.jpg twice to return to the menu.

Back to Equipment Reports or Equipment Tables