GL sub-system direct post
This option allows you to arrange for specified GL sub-systems to bypass
the GL batch post period and post into the open GL period in reference
category #5005.
- At the EMMS main menu, select Administration
| Interfaces | Assist Interface Programs | GL Sub-system Direct Post.
The Sub-system Direct Posting
change screen appears.
- Click Add
.
The Sub-system Direct Posting
add screen appears.
- Fill in the fields as required.
- Click Enter
to save the sub-systems.
- Click Exit
to return to the menu.
Back to Interfaces